194
edits
No edit summary  | 
				No edit summary  | 
				||
| Line 26: | Line 26: | ||
<gallery>  | <gallery>  | ||
File:  | File:Combining the mushroom threads growing on rye with the straw.jpg  | ||
File:Growth phase_06.01.2023.jpg  | |||
File:Filling formwork.jpg  | File:Filling formwork.jpg  | ||
File:Growth phase_21.12.2022.jpg  | |||
File:Filling the building element with straw.jpg  | File:Filling the building element with straw.jpg  | ||
File:Fully assembled building block.jpg  | File:Fully assembled building block.jpg  | ||
File:Growth phase of mushrooms outside the formwork.jpg  | File:Growth phase of mushrooms outside the formwork.jpg  | ||
File:Removing the blocks from the formwork.jpg  | File:Removing the blocks from the formwork.jpg  | ||
File:Sterilizing the bags.jpg  | File:Sterilizing the bags.jpg  | ||
| Line 38: | Line 38: | ||
File:The result of the two-day work process.jpg  | File:The result of the two-day work process.jpg  | ||
File:Combining elements into a complex building block.jpg  | File:Combining elements into a complex building block.jpg  | ||
File:Compressive strength testing of the building element_1.png  | File:Compressive strength testing of the building element_1.png  | ||
File:Compressive strength testing of the building element_2.png  | |||
</gallery>  | </gallery>  | ||
edits