16
edits
|  (→Risks) | |||
| (4 intermediate revisions by 2 users not shown) | |||
| Line 49: | Line 49: | ||
| ==Risks== | ==Risks== | ||
| The scale is a risk factor because synchronizing can be hard. | The scale is a risk factor because synchronizing can be hard. | ||
| *Solve by testing it. | *Solve by testing it.   | ||
| <br> | |||
| The environment should be ant-friendly and make sure they cannot escape. | The environment should be ant-friendly and make sure they cannot escape. | ||
| *Solve by testing and knowledge about ants. | *Solve by testing and knowledge about ants.   | ||
| <br> | |||
| The ants could die or be very inactive over a long period | The ants could die or be very inactive over a long period | ||
| *Buying or collecting another (second or third) colony | *Buying or collecting another (second or third) colony   | ||
| <br> | |||
| Integration both gaming ideas to one board could be problematic <br> | Integration both gaming ideas to one board could be problematic <br> | ||
| Building a lot of board could cost a lot of time | Building a lot of board could cost a lot of time | ||
| Line 91: | Line 94: | ||
| The frequency of the route-decision making points is something we can use in order to make decisions about how big the field should be in the end. | The frequency of the route-decision making points is something we can use in order to make decisions about how big the field should be in the end. | ||
| == Reference Material== | |||
| Building a good Labyrinth [http://www.astrolog.org/labyrnth/psych.htm] | |||
| Exampleof a maze we can use [https://upload.wikimedia.org/wikipedia/commons/5/59/Labyrinth_Versailles_plan.jpg] | |||
edits