Line 57: Line 57:
-Combine ideas with people that are dealing with the virtual environment: after 2 weeks <br>
-Combine ideas with people that are dealing with the virtual environment: after 2 weeks <br>
'''A lot of things are depending on decision of other groups!''' <br><br>
'''A lot of things are depending on decision of other groups!''' <br><br>
-Building testing mock ups (if needed)
-Prototyping
*2 weeks
''*2 weeks''
**scale
**scale
**opening/closing mechanics
**opening/closing mechanics
Line 66: Line 66:
<br>
<br>
-Preparing maps and creating laser cut file
-Preparing maps and creating laser cut file
*2 weeks
''*2 weeks''


<br>
<br>
-Building the board
-Building the board
*2 weeks intense work
''*2 weeks intense work''
*can be divided into teams:
*can be divided into teams:
**electronics
**electronics

Revision as of 16:24, 8 May 2017

Success Criteria

Decide on the scale of the arena for the ants

  • how fast are ants moving - how long does it take for the ants to find something
  • how fast does this compare to human movements -done
  • how many turns/intersections do we want in the environment

Discussion

  • Which areas do we want to reproduce for the ants? (Weimar, Düsseldorf Park,...)
  • integrating human movement (projection, laser pointer, little robot avatar,...)
  • before the laser cutting part we should present all ideas to the group!

Activities & Order

Think how the avatar of the human can be incorporated Feedback with human environment so the two are matching
1. Decide on the lay-out/design of the map.

  • How fast do human move? How fast the ants? (Test)
  • Which areas do we want to reproduce for the ants? (Weimar, Düsseldorf Park,...)


2. How does the board work. (Prototyping)

  • technical drawings
    • general layout
    • cleaning the board
    • integrating tracking system
    • integrating human movement (projection, laser pointer, little robot avatar,...)
  • details
    • how to insert the trigger-object
    • entrance; docking the nest
    • safety plans (air, what if they escape, ...)
    • electronics
  • material list:
    • electronics
      • Laserpointers for human avatar
      • small robot for human avatar
      • projection
    • building materials
      • wood
      • plexiglas (most logic option because of visibility)
      • plastic tubes min. 6mm
      • screws
      • glue (Holzleim and Hot glue)


3. Actual Board

  • find and prepare maps
    • www.schwarzplan.eu or www.mapbox.com, ask some architecture students, Katasteramt, googlemaps etc.
  • prepare lasercut file
  • building the actual environment

Risks

  • The scale is a risk factor because synchronizing can be hard.

Solve by testing it.

  • the environment should be ant-friendly and make sure they cannot escape

Time / Schedule

-Scale

  • experiments for the scale: first two weeks

-Combine ideas with people that are dealing with the virtual environment: after 2 weeks
A lot of things are depending on decision of other groups!

-Prototyping *2 weeks

    • scale
    • opening/closing mechanics
    • human avatar
    • material test


-Preparing maps and creating laser cut file *2 weeks


-Building the board *2 weeks intense work

  • can be divided into teams:
    • electronics
    • actual board

Things done so far

First testing with speed of the ants. A track of 60 cm (without the dead ends, this is just the distance to the goal) with 3 intersections was accomplished in an average time of: 90 sec

Compared to humans: Humans walk 1.5 m/s That would mean that in 90 seconds they can cover a distance of 135 meters. Meaning that every 45 meters you would have a route decision making point.

The frequency of the route-decision making points is something we can use in order to make decisions about how big the field should be in the end.